Thursday, October 28, 2010
Maybe A Passive Solar Cottage Prefab SIP House Kit Sits At The End Of This Rainbow?
A contractor friend of mine once said that contracting, big or small, consists mainly of overcoming obstacles. Ain't it the truth! After several delays in getting our final panel order done, it is now in production. As luck would have it, and in compliance with a parallel to Murphy's Law, the panels are scheduled to be done and delivered right about the week we will be going on a long scheduled vacation. I would change my travel plans, but with non-returnables, that would be a real waste. So, we decided to move ahead with construction of the one car garage, which will be pole framed. We rented a Bobcat, and after a rather hairy morning slipping and sliding, started to see the driveway and garage locale take shape.We expect the garage should be dried in by the time the panels are scheduled for delivery, November 16th.
We've also framed up the interior walls and pretty much finished up the plumbing. A friend asked my brother why we were building the house inside out. While it may seem that way, the wall framing really needed to be done in the bedroom section of the house, since it has flat ceiling SIP's, with an unconditioned attic. The span of the panels would have necessitated framing of at least two of the walls anyway.
Unrelated to the building project, I saw one of the most vivid rainbows I've ever seen yesterday after that huge storm came blowing through. It looked like it ended in my neighbor's front yard.
I didn't check for a pot of gold, although I sure could use it!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment